Concrete
Materials
Area
Labor
Summary
Concrete Volume Calculator
Calculation: Volume = (Length × Width × (Depth/12)) / 27 cubic yards.
Bags needed = (Volume × 27) / 0.45 (each 60lb bag = 0.45 cu ft).
Total Volume
3.70
Cubic Yards
Total Bags Needed
167
60lb Bags
Total Cost
$462.50
Including Wastage
Material Estimation Calculator
Total Units Needed
3,713
Units
Total Cost
$2,784.75
Including Wastage
Area Calculator
Rectangle
Circle
Triangle
Trapezoid
Labor Cost Calculator
Project Summary
Cost Breakdown
Concrete Cost:
$462.50
Material Cost:
$2,784.75
Labor Cost:
$17,600.00
Equipment & Fees:
$1,000.00
$21,847.25